How Telecom engineer do PM #PREVENTIVE_MAINTENANCE in Mobile sites:
1.Shelter Satus check (Lighting ; Systems Alarms+ Doors+Locks+Shelter Tower Fence + civil work Veiw +Holes +Dust...)

2.Cooling Air conditional unite system(Filter cleaning + Temp. Degree is good.......)Reporting To AC team

3.tower equipments +Ladder +Lighting poles +Painting + Rust +Inspection status Report.

4.Cables Tray + cable climb fitting + Cables And feeders+Labeling andTagging

5.Electrical check +Batteries voltages test +UPS system back up  + Generator + Fual..........)

6.Safety tools & Rules (First Aid +Fire extinguishers +Safety signs.......).

7. Arrangements ; Cleaning and Housekeeping

8.Documentation ;Data sheets updated and Reporting to do ...9. In next planning.

9.CMR Planning and job (Corrective Maintenance Report)

بأختصار صيانه عامه دوريه للسايت من صيانه للتكييفات و الكهرباء و تكميل بعض الحجات الناقصه و النضافه العامه و ترتيب المكان و عمل الشيت بمواصفات الموقع.. يعني ممكن نقول بنجدد المكان
Shortly, periodic general maintenance of the site of the maintenance of air conditions  , electrification and supplement some of the arguments loose ends.

In PM task you enter the site and want to renew it . any mistakes done in the site you will fix it

first : you will check the site out door , what missing ? what stolen :) ? and any thing will not match with site design .

in out door you should check

MW micro wave dishes
clean it from dust and type site number and site number in the line of side ,to make easy for any one look to it

Cable tray
you should make sure that cable tray in good condition and its base installed in the ground with the wright way
FEEDERS ISOLATION

you should check feeder isolation and change it to make sure that no vswr will appear in case of feeders not isolated well

check too that feeders have the colored sector tabe , each feeder has its color notification with its sector

DOOR SENSOR LIGHT
check door sensor light and its connection with shelter and change the light lamp with new one and clean the cover for more light

BATTERIES LABELS
if you found them :)

do your battery test and take your time in this test , you will check the ability of the batteries ,

put labels for each battery to show its number in the row and connection, clean the batteries and change the damaged one .

battery test sheet
FEEDERS EARTH

===================================================================
The most important thing you do inside shelter and out side shelter in PM is systematization all cables with tie robe  and put them in their position

Jumber systematization

Finally site clean up and fill your sheet and follow the steps in the PM sheet so you will never forget any thing ..

http://betelecomengineer.blogspot.com/2013/12/how-telecom-engineer-do-pm-preventive.html?m=1

#هندسة_الاتصالات

2 comments:

  1. Alfazal Engineering providing services for Cable tray, Tower tray, and other sheet metal work at very economical prices with the best delivery time all over Pakistan. tower trays for the refinery. Cable Tray street lighting poles manufacturer in Pakistan by Al-Fazal Engineering Perforated Cable Tray Made of Sheets With Perforation on the based. Cable Gland, Cable tray distributor in Pakistan. We are available for your support 24/7 and 100% guarantee for quality. We never compromise in the quality of the cable tray and other products.
    Cable tray

    ReplyDelete